
HOTEL CONSTRUCTION · GTA
Hotel Construction in the GTA
Every room out of service is revenue lost. We build to protect both.
BuildwithMGI is a licensed Ontario general contractor building and renovating hotels for owners and investors across the GTA. Founded in 2014, the firm builds to franchise brand standards and the Ontario Building Code, including barrier-free suites and sound separation between rooms. Schedules are set around the brand's opening date and the lender's draw program.
Owner risks
Three ways a hotel project erodes returns.
Rooms out of inventory
Every block of rooms offline costs nightly revenue. We phase by floor so most rooms keep selling.
Brand deadlines
A PIP or opening date missed can cost the flag. Schedules are built backward from the franchisor's dates.
Code upgrades found late
Barrier-free suites, sprinklers and sound separation triggered by renovation scope. We scope them before pricing.
Revenue-protection phasing
Renovated floor by floor. Trading throughout.
We take rooms out of inventory in blocks, seal work zones from guest corridors, run noisy work in daytime hours and keep life-safety systems in service. You see rooms offline per week in the schedule before work starts.
Regulatory path
Five approvals from design to first check-in.
Technical scope
What's inside a BuildwithMGI hotel contract.
Guestroom and bathroom fit-out to brand prototype, repeated room by room to one standard.
Sound-rated walls and floor-ceilings between suites and at corridors.
Barrier-free suites to the Building Code minimum or the brand standard, whichever is higher, with power door operators at suite entrances.
Sprinkler and fire alarm systems designed for the full occupancy.
Guestroom HVAC (PTAC, VRF or four-pipe) and corridor make-up air.
Central domestic hot water sized for the morning peak.
Elevators installed and inspected under TSSA.
Pool rooms with dehumidification and corrosion-resistant finishes, built for public health inspection.
Back-of-house laundry, housekeeping and service areas.
Process
From PIP to first guest.
PIP or feasibility review.
Design and brand approval.
Permits and specialty approvals.
Phased construction, rooms returned weekly.
Occupancy and brand opening inspection.
Our crews do the work, each carrying its own insurance and WSIB coverage.
FAQ
Questions owners ask.
Send us the PIP. We'll send back the phasing and the number.
Share the brand's property improvement plan or your development drawings. A family owner reviews it and replies with a preliminary budget and room-out schedule within one business day.
