RESTAURANT CONSTRUCTION · GTA

Restaurant Construction in the GTA

Every week late is rent on a room that isn't selling. We build to your opening date.

BuildwithMGI is a licensed Ontario general contractor building full-service restaurants, commercial kitchens and QSR franchise locations across the GTA. Founded in 2014, the firm builds to franchisor brand standards and to the exhaust, fire suppression and grease interceptor requirements inspectors check first. Every schedule is built backward from the opening date the landlord and franchisor have set.

Est. 2014
Family-owned
Licensed Ontario builder
Tarion-registered
York Region · GTA
Hamilton · Barrie · Ottawa · Cornwall
An array of multi-unit projects
Delivered
Commercial store builds delivered.
Multi-unit, warehouse and auto shop garage builds since 2014.
Ottawa branch.
No remote-mobilization premiums in Eastern Ontario.

Owner risks

Restaurant openings slip for three reasons. We plan against all three.

Base-building surprises

Undersized gas, electrical service without the capacity, no exhaust route, nowhere to put the grease interceptor. We find them in the work letter, before you sign.

Failed inspections

Hood, suppression, grease interceptor and public health are where inspectors look first. We build to those standards from rough-in, so final inspection is a formality.

A missed opening date

Your rent-free period and your franchisor's opening date don't move. Our schedule is built backward from them and tracked weekly.

Opening-day math

We schedule backward from the day you open.

Most leases give a fixed rent-free fixturing period. Most franchisors set the opening date before the build starts. So we start at opening day and work back: inspections, equipment delivery, rough-ins, permit and long-lead items like hoods, walk-ins and make-up air units. You see the critical path at the first meeting and a weekly update after that.

Request a Preliminary Budget →
Lease signing
Permit
Rough-in
Equipment set
Inspections
Opening day

Scheduled backward from opening day. Long-lead items (hoods, walk-ins, make-up air units) ordered with the permit.

What we build

From flagship dining room to franchise rollout.

Full-service restaurants

Dining rooms, bars and full commercial kitchens.

QSR franchise locations

Built to brand standard, including drive-thru lanes where the site allows.

Fast casual

High-throughput counters and open kitchens.

Commissary and delivery kitchens

Production kitchens with no dining room.

Technical scope

What's inside a BuildwithMGI restaurant contract.

Kitchen hood and exhaust designed and installed to NFPA 96, with fully welded grease duct and required clearances.

Fire suppression over cooking appliances, interlocked with the gas shut-off.

Tempered make-up air balanced to the exhaust.

Grease interceptor sized to the Ontario Building Code, permitted, and CSA B481.1-compliant where installed at the fixture.

Walk-in coolers and freezers, with refrigeration and condensers located for service access.

Gas piping sized for the full cooking line, installed by a TSSA-registered gas contractor.

Electrical service upgrades and dedicated equipment circuits.

Floor drains, indirect waste and hand sinks where public health requires them.

Smooth, sealed, washable finishes that meet Ontario's food premises regulation.

Barrier-free entrances and washrooms to Ontario Building Code requirements.

Process

From lease to first service.

01

Work-letter review

Base-building capacity checked before you sign.

02

Design and brand coordination

Franchisor package, equipment schedule and long-lead orders placed.

03

Permits

Building, grease interceptor and signage approvals.

04

Build

Rough-ins inspected, equipment set, weekly schedule updates.

05

Inspections and opening

Building, fire and public health sign-off, brand turnover documents, keys to your team.

Our crews do the work, each carrying its own insurance and WSIB coverage.

FAQ

Questions owners ask.

Does my restaurant need a grease interceptor?

Yes. In Toronto, the Sewers By-law requires every food service establishment to install, operate and maintain a grease interceptor, and the Ontario Building Code requires interceptors for non-residential kitchens. Installation needs a building permit, point-of-source units must meet CSA B481.1, and Toronto fines for businesses reach $100,000.

What does a commercial kitchen exhaust system need?

A hood sized to the cooking line, a fully welded grease duct with required clearances, a fire suppression system over the cooking appliances and make-up air balanced to the exhaust. We design and install to NFPA 96, the standard the Ontario Building Code references for commercial cooking ventilation.

Can you build to our franchisor's brand standards?

Yes. We build from the franchisor's design package and specifications, coordinate approved vendors and national-account equipment, and deliver the inspections and photo documentation the brand requires at turnover.

What is landlord's work versus tenant's work?

The lease's work letter splits the base building from your fit-out. We review it before you sign to confirm gas capacity, electrical service, the exhaust route and a grease interceptor location, because those are the costliest surprises in a restaurant build.

How long does a restaurant build-out take?

Quick-service and fast-casual build-outs typically run 10 to 16 weeks after permit, and full-service restaurants 16 to 28 weeks, depending on kitchen complexity and base-building condition. We schedule backward from your opening date and track it weekly.

Send us the lease before you sign it.

Share the work letter, the listing or the franchisor's package. We'll flag the base-building gaps and give you a preliminary budget within one business day.